Sign In | Join Free | My carsrow.com
China Shenzhen CPET Electronics Co., Ltd. logo
Shenzhen CPET Electronics Co., Ltd.
Verified Supplier

1 Years

Home > New Energy Solutions >

EV Vehicle Motor Controller BMS Battery Management System Board Burn In Test

Shenzhen CPET Electronics Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

EV Vehicle Motor Controller BMS Battery Management System Board Burn In Test

  • 1
  • 2

Brand Name : CPET

Model Number : CP-BMS02

Place of Origin : China

MOQ : 2sets

Price : 9500dollars/set

Payment Terms : L/C

Supply Ability : 30sets/month

Delivery Time : 45 work days

Packaging Details : Wooden case packing

Trolley size (mm) : L1600*W1100*H1600

Warranty : 1 year

weight : 400kg

Contact Now

EV Vehicle Motor Controller BMS (Battery Management System)Board Burn-In Test

Scope of application
EV Vehicle Motor Controller BMS Battery Management System Board Burn In Test
This equipment is mainly used for high temperature burn-in test of BMS board of vehicle motor controller.
Performance parameters
EV Vehicle Motor Controller BMS Battery Management System Board Burn In Test
Skills requirement Burn-in cabinet size(mm) L1600*W1100*H1600
Rated working voltage 380Vac
Rated insulation voltage 690Vac
Rated frequency 50Hz
Rated working current 32A
Power frequency withstand
voltage for 1 minute
2500Vac
UUT input specifications 12VDC/5Amax*36passageway
UUT output specifications Static burn-in without load
Number of burn-in stations 36 (6 layers * 6, hierarchical control)
Burn-in temperature requirements

Product area (50 ℃ ~ 85 ℃) can be set, ± 3 ℃ precise control

Temperature rise

Requires a temperature rise from room temperature to 85 ° C within 15 minutes. When the internal temperature is high,the surface temperature of the burn-in cabinet is below 35 °

Temperature rise

Circulation air control, hot air is prohibited to be discharged directly to the workshop
environment

Master switch Route 1 32A
Branch switch 6 way 10A/30mA/3P or 1P
Noise <70dB (measured at a distance of 1m from the device)
Structural requirements Dimension(mm) 1600(W)*1100(D)*1600(H)
In and out line Support next in and next out
Installation method Floor installation
Burn-in slot layout requirements 6 layers, 6 burn-in (3 before 3) slots per layer; each layer is individually powered on
Docking method Cable flexible connection
Cabinet door Front and rear double doors
Maintenance method Front, back, left and right maintenance
Monitor and indicate Monitoring requirements

Touch screen displays the power-on state and sensor state of each slot

Safety requirements

1.With power supply, product and other key components short-circuit, over-current field energy analysis
2.With energy analysis under over-temperature, smoke and liquid leakage scenarios
3.The control circuit has a leakage protection
function
4.Possess the ability to detect and operate ground faults and leakage faults
5.PLC control, real-time monitoring of burn-in cabinet status

Panel instructionsv Status indicator of each slot

Product Tags:

bms burn in test

      

bms burn in equipment

      

motor controller burn in test

      
 EV Vehicle Motor Controller BMS Battery Management System Board Burn In Test Manufactures

EV Vehicle Motor Controller BMS Battery Management System Board Burn In Test Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shenzhen CPET Electronics Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)